NVIDIA Announced Next-Gen B300, Rubin, and Vera at GTC 2025; Shift from GB NVL72 to VR NVL144 and Rubin Ultra NVL576 to Advance Memory, Liquid-Cooling, and CPO Communication Network
Last Modified
2025-03-19
Update Frequency
Aperiodically
Format
TrendForce reports NVIDIA announced next-gen B300, Rubin, and Vera at GTC 2025, emphasizing memory, liquid-cooling, and CPO network advancements, shifting from GB NVL72 to VR NVL144 and Rubin Ultra NVL576. NVIDIA stresses scaling up, developing open-source software Dynamo through edge AI inference. Vera Rubin NVL144 TDP is expected to reach 200kW, making liquid-cooling inevitable. Rubin Ultra adopts 1024GB HBM4e, with technical challenges increasing supply risks. Vera CPU enhances core performance and supports upgraded memory specifications. NVIDIA promotes switch solutions based on silicon photonics/CPO. TSMC actively researches CPO, aiming to complete first-gen optical communication development in 2025, gradually improving AI chip performance.
<Total Pages:8>

Category: Semiconductors
Spotlight Report
-
AI Servers Absorbing LPDRAM Capacity, Signaling Tight Supply as the New Norm
2026/06/05
Selected Topics
PDF
-
Mature Memory Structural Shortage: Price Plateau Era Arrives - 2H26
2026/06/02
Selected Topics
PDF
-
Cascading Shortages in Consumer DRAM: How Capacity Pivots Fuel Legacy Node Adoption
2026/06/17
Selected Topics
PDF
-
Smartphone Storage: AI Driven Growth - 2026
2026/03/18
Selected Topics
PDF
-
HBM Market Outlook:HBM Suppliers Seize Pricing Power as AI Demand Fuels Explosive Contract Price Surge
2026/05/27
Selected Topics
PDF
-
Optical Interconnect Supply Chain Restructuring and Opportunities in Response to Expanded US Export Controls
2026/04/30
Selected Topics
PDF
Selected TopicsRelated Reports
Download Report
2,000
Membership
- Selected Topics New
- Selected Topics-TF-0056_NVIDIA Announced Next-Gen B300, Rubin, and Vera at GTC 2025; Shift from GB NVL72 to VR NVL144 and Rubin Ultra NVL576 to Advance Memory, Liquid-Cooling, and CPO Communication Network
Spotlight Report
-
AI Servers Absorbing LPDRAM Capacity, Signaling Tight Supply as the New Norm
2026/06/05
Selected Topics
PDF
-
Mature Memory Structural Shortage: Price Plateau Era Arrives - 2H26
2026/06/02
Selected Topics
PDF
-
Cascading Shortages in Consumer DRAM: How Capacity Pivots Fuel Legacy Node Adoption
2026/06/17
Selected Topics
PDF
-
Smartphone Storage: AI Driven Growth - 2026
2026/03/18
Selected Topics
PDF
-
HBM Market Outlook:HBM Suppliers Seize Pricing Power as AI Demand Fuels Explosive Contract Price Surge
2026/05/27
Selected Topics
PDF
-
Optical Interconnect Supply Chain Restructuring and Opportunities in Response to Expanded US Export Controls
2026/04/30
Selected Topics
PDF