Price Trends

PV Price Trends

Through detailed survey cross-survey of data from major suppliers and procurement parties, Green Energy Research is able to provide an accurate weekly report on spot prices of key PV components. Green Energy Research can also quickly produce a detailed market analysis for a VIP client, as its staff can refer to an enormous price database containing a long record of past contract transactions. Identifying price trends and giving long-term price forecasts have been an integral part of Green Energy Research’s market intelligence services.

Wafer (Per Pcs.)

Last Update 2026-09-16

Item High Low Avg. Change
N-Type M10 Mono Wafer - 183mm/130μm (RMB) 1.02 0.98 1.00 -1.96 %
N-Type G12 Mono Wafer - 210mm/130μm (RMB) 1.15 1.08 1.10 -1.79 %
N-Type 210R Mono Wafer-210*182mm/130μm (RMB) 1.05 1.00 1.02 0.00 %
Related Reports


Module Tenders Exceed 14 GW in August; GCL and JA Solar Lead Bidding Price Benchmark


In August 2026, China's domestic PV module tenders reached 7.72 GW, a sharp sequential increase; awarded volume (including shortlisted candidates) hit 14.11 GW, with GCL and JA Solar leading the benchmark-setting awards. The average bid price for N-type modules came in at RMB 0.722/W, edging slightly lower overall.

August PV Module Tender Volume Reaches 7.72 GW

According to incomplete statistics from EnergyTrend, China's domestic PV module tender scale reached 7.72 GW in August 2026. China Railway Construction Corporation (CRCC) launched a 3 GW TOPCon module centralized procurement, China South-to-North Water Diversion Group issued a 1.3 GW module centralized procurement, and Shenergy Co., Ltd. kicked off a 1 GW module frame procurement — driving a marked uptick in tender activity.

Tenders explicitly specified for N-type modules totaled 7.51 GW in August, accounting for 97.37% of total tender volume. Among these, TOPCon module tenders stood at 4.79 GW, representing 63.77%; BC module tenders reached 0.3 GW, accounting for 3.99%.

August PV Module Awarded Volume Hits 14.11 GW

According to incomplete statistics from EnergyTrend, announced bid results and winning candidate awards for PV modules reached 14.11 GW in August 2026, comprising 13.24 GW of finalized awards and 0.87 GW of first-round winning candidate volume. Two projects — China Resources Power's 5.4 GW module centralized procurement and CNNC's 4.3 GW module centralized procurement — together contributed over 70% of the month's finalized awards.

By company, GCL and JA Solar stood out brightly, securing awarded volumes of 2.4 GW and 2.24 GW respectively, leading the August award market. Specifically, GCL won Lot 1–Section 1 and Lot 2–Section 1 of China Resources Power's 5.4 GW module centralized procurement; JA Solar won Lot 1–Section 2 and Lot 3 of the same China Resources Power tender, along with multiple module procurement packages from CHN Energy (National Energy Group).

N-Type Module Bid Prices Slip Slightly

In August 2026, bid prices for modules explicitly specified as N-type ranged from RMB 0.624/W to RMB 0.883/W, with an average of RMB 0.722/W, down modestly from RMB 0.743/W in the previous month.

The lowest bid was offered by Hongyuan Green Energy in the PV module procurement for the Songnong Station distributed PV project; the highest bid was submitted by Runjia New Energy in the frame procurement of PV modules for the EPC+O (EPC general contracting) rooftop distributed PV construction project for public institutions in Yangdong District, Yangjiang City.

Breaking down by technology route:

TOPCon modules: bid prices ranged from RMB 0.663/W to RMB 0.783/W, averaging RMB 0.712/W. The lowest bid was submitted by GCL in Lot 1–Section 1 of China Resources Power's 5.4 GW module centralized procurement; the highest bid came from Trina Solar in the PV module equipment procurement for Dadu River Company's Aba Rong'an 1,150 MW PV project (Phase II).

BC modules: Tongwei, Aiko Solar, Gokin and LONGi were awarded China Railway 16th Bureau Group Co., Ltd.'s 2026 BC-type PV module strategic procurement project. As the specific tender scale of this project was not disclosed, the per-watt unit price cannot be calculated for the time being.

Source:EnergyTrend


The price information provided by EnergyTrend is primarily a result of periodical survey of a pool of major manufacturers via telephone, questionnaires, and site visits. EnergyTrend cross-surveys major buyers and suppliers throughout the supply chain and strives to ensure all enclosed price information reflects actuality.

EnergyTrend takes a conservative attitude toward the enclosed price information. All surveyed manufacturers are to be kept anonymous and EnergyTrend will not respond to price enquiry about any individual manufacturer. All statistical numbers gathered are used to derive a particular price quote through weighted calculation.

With the historical contract price information in our database and capability of conducting fast and in-depth market analysis, EnergyTrend is equipped to provide both price trend and market intelligence to our valued members.

More Info:

High - The highest of the prices. Low - The lowest of the prices. Average - The average of all prices. Change= (X-Y) / Y x 100%. X= The Highest price of this item in this issue. Y= The Highest price of this item in the previous issue.

Starting January 2009- Weekly Spot Price (Monthly Price Quotation For Reference)
(Poly-Wafer-Solar Cell-PV Module-ASP)

Starting March 2010- Weekly Spot Price (Poly-Wafer-Solar Cell-PV Module-ASP)

Starting January 2011-Weekly Spot Price(Poly-Wafer-Solar Cell- PV Module- Thin Film Module- PV Inverter)

Get in touch with us


Get in touch with us