SpaceX’s 10 GW Push: Strong Execution Time but Lack of Permitting Evidence

icon

Last Modified

2026-11-20

icon

Update Frequency

Aperiodically

icon

Format

PDF



SpaceX builds at rare speed, but permits cover only a fraction of its 10 GW goal. BTM power and Texas policy will decide the gap.

Key Highlights

  • Expansion: Colossus capacity is growing fast and should rise markedly by year-end, as SpaceX shifts to a neocloud leasing model.
  • Permit Gap: Permitted compute remains well short of the goal; other sites and power sources are absent from filings.
  • Power: BTM gas turbines shorten build times, but the cluster faces a gap once temporary units are removed.
  • Policy Risk: Texas scrutiny is tightening; Starbase has its air permit, while Terafab has yet to file.

Table of Contents

  1. Key Takeaways
  2. Where Could 10 GW Come From?
    • SpaceX Data Center Capacity by Site, 2025–2027
    • SpaceX Power Supply for 2027, Permitted vs. Purchased
  3. Colossus Cluster (Tennessee and Mississippi)
    • Colossus Cluster Sites, Tennessee–Mississippi Border
  4. Arizona
    • Cochise Super Compute Concept Plan, 3.5 GW Layout on Arizona Electric Power Parcels
  5. Texas
    • What to Watch

<Total Pages: 10>

SpaceX Data Center Capacity by Site, 2025–2027





USD

55,000