2026 Glass Substrate TGV Process Evolution and the Taiwanese Foundry Landscape
Last Modified
2026-11-12
Update Frequency
Not
Format
With the development of the glass substrate industry, Through Glass Via (TGV) technology continues to undergo process iterations. In addition, following market reports that NVIDIA is evaluating the adoption of glass substrates for AI chips after 2028, companies such as TPK, Chime Ball Technology (CBTech), Innolux, Contrel, Group Up (GP), Kinsus, and SCHMID also provided updates on current TGV industry conditions and challenges at the 2026 TPCA Show forum, indicating that TGV is one step closer to achieving mass production and attracting more vendors to enter the TGV foundry market.
This report primarily provides an in-depth analysis of: (1) TGV process steps and corresponding equipment vendors; (2) the TGV foundry market and related vendors; (3) the outlook for Glass Core mass production. It aims to analyze TGV process transitions, the role of the TGV foundry market in the supply chain, and future prospects.
Key Highlights
- As the glass substrate industry keeps growing, Through Glass Via (TGV) processes continue to go through new iterations.
- Market reports that NVIDIA is evaluating glass substrates for AI chips have drawn more industry attention.
- Major supply chain players say TGV still faces challenges but is now closer to mass production.
- A growing number of vendors are entering the TGV foundry market.
- The report focuses on TGV processes and equipment, the role of foundries in the supply chain, and the outlook for Glass Core mass production.
Table of Contents
- TGV Process Steps and Corresponding Equipment Vendors
- Figure 1: Schematic of Laser Modification
- Figure 2: Schematic of Etching
- Table 1: Comparison of Wet Etching vs. Dry Etching Characteristics
- Figure 3: Schematic of Buffer Layer Deposition
- Figure 4: Schematic of Seed Layer Deposition
- Figure 5: Schematic of Copper Electroplating
- Figure 6: Schematic of Butterfly vs. Bottom-up Copper Electroplating
- Figure 7: Schematic of CMP
- Figure 8: TGV Process Steps and Corresponding Equipment Vendors
- Figure 9: Schematic of Full-Panel vs. Embedded CCL Frame Processes
- Table 2: Comparison of Full-Panel vs. Embedded CCL Frame Characteristics
- TGV Foundry Market and Related Players
- Figure 10: Upstream and Downstream Relationships in the TGV Supply Chain
- Figure 11: TPK Glass Core Samples
- Figure 12: CBTech TGV Flowchart and Glass Core Samples
- Glass Core Mass Production Outlook
- Table 3: Comparison of TGV Foundries
- TRI’s View
<Total Pages: 14>

Spotlight Report
-
Enterprise SSD Cuts Pull NAND Price Drop to 2Q27
2026/11/17
Selected Topics
PDF
-
DRAM Demand Concerns Mount, Raising Risk of Contract Price Declines in 2028
2026/11/25
Selected Topics
PDF
-
AI Surge Drives NOR Flash Deficit: 2026 Industry Outlook
2026/09/10
Selected Topics
PDF
-
iPhone 18: Modest Hardware Gains, Pricing and AI Drive Sales
2026/09/02
Selected Topics
PDF
-
US Data Center Buildout Faces Midterm Risks
2026/10/07
Selected Topics
PDF
-
AI Server Boom Outpaces U.S. Grid Buildout
2026/09/07
Selected Topics
PDF
Selected TopicsRelated Reports
Download Report
2,500
Membership
- Selected Topics
- Selected Topics-226_2026 TGV Process Evolution, Key Player Progress, and Foundry Market Landscape New
Spotlight Report
-
Enterprise SSD Cuts Pull NAND Price Drop to 2Q27
2026/11/17
Selected Topics
PDF
-
DRAM Demand Concerns Mount, Raising Risk of Contract Price Declines in 2028
2026/11/25
Selected Topics
PDF
-
AI Surge Drives NOR Flash Deficit: 2026 Industry Outlook
2026/09/10
Selected Topics
PDF
-
iPhone 18: Modest Hardware Gains, Pricing and AI Drive Sales
2026/09/02
Selected Topics
PDF
-
US Data Center Buildout Faces Midterm Risks
2026/10/07
Selected Topics
PDF
-
AI Server Boom Outpaces U.S. Grid Buildout
2026/09/07
Selected Topics
PDF